Alexandria Shipyard

In 2015, We supervised the total transportation process of Beshay Steel cranes from Dekhila port to Alexandria port. Three Liebherr LHM 400 cranes were lifted and loaded on HANSA HEAVY LIFT ship, then transported and unloaded at Alexandria shipyard. All the safety measures were taken and calculated by the team in charge of this critical operation.

1/6

© 2020 by RhinoWorks for Equipment

  • Facebook
  • LinkedIn

RHINOWORKS

FOR EQUIPMENT